Myloc Construction

Rebuilding Regjeringskvartalet

Statsbygg and UCO ensure control of all vehicles delivering materiels with Myloc Construction. Logistical management with high stakes during the rebuild and expantion of Oslo’s government quarter. The work of restoring the premises housing the seat of the Norwegian government has been ongoing after the complex became the target of a terror attack in 2011. The decision was made to not only rebuild the existing structures but to also create new workspaces that meet heightened security standards and gather Oslo’s about 4100 government officials into one central district.

Managing a demanding timeline and site bottlenecks

Karlatornet Case Study: Leveraging efficient production with digitized construction logistics. Karlatornet is a core part of the new city development on the island of Lindholmen in Gothenburg known as Karlastaden. Swedish construction company Serneke managed the project development and EPC. Karlatornet is the tallest building in the Nordic Countries at 246 m and is the first and largest building in the Karlastaden development plan. The construction of the tower alone covered 100,000 m2 in total. The challenging combination of a tightly spaced urban construction site, limitations posed by the required vertical transports, and the desired speed of construction identified the need for logistical management capability as a key part of the project setup from the very start.

Good construction logistics with Metier and Myloc in Oslo

Welcome to this seminar with Metier och Myloc Construction.      Good Construction Logistics Gains, control and sustainability in large-scale projects.   Sign up for the event › 25 of September 2024, 14.00 – 16.45 | Hoff X, Hovfaret 10 at Skøyen.   Greater gains through digital construction logistics. This seminar addresses those in need of

Morrow Batteries’ Gigafactory Leverages Digitized Logistics 

Streamlining Project Supply Chains – Morrow Batteries, Metier and Myloc Construction. Morrow Batteries is creating an innovative industrial site in southern Norway built on several cornerstones; a locally secured renewable energy supply, access to a deep sea port to ensure international freight capabilities and a long-term development concept. Eyde Energy Park outside the city of Arendal has the capacity to host multiple large Giga battery cell factories, built step-by-step. Morrow began the construction of their first giga-scale factory in 2020. This first project is not only a commercial investment but also forms the foundation of accumulated experience to be utilized in future projects in the area.

Digitaliserad bygglogistik - Anmäl dig till seminarium med LTU

Myloc Construction tip: Knowledge seminar on digitized construction logistics with LTU

Seminar on construction logistics coming up this spring. Join the discussion when the industry meets at Luleå University of Technology to talk about the trend towards more digitalized construction logistics and how we can create safer and more efficient construction sites. Myloc Construction’s own Anders Eklund is one of the speakers and will tell you

Bravida_Förbifart_Myloc_Construction

Bravida Förbifart Akalla and Myloc Construction

Sweden’s longest motorway tunnel is taking shape Myloc Construction has become central partner for Bravida during their work at the new tunnel E4 Förbifart Stockholm. In this giant project led by the Swedish Transport Administration, Bravida is responsible for installing the electrical supply, lighting, plumbing, VA and fixed extinguishing systems. Myloc supplies the system support

Stavanger sjukhus prosjekt sjukhusprojekt New hospital Myloc Construction

The Stavanger hospital project – The biggest construction project in Norway

This article is part of a series where we at Myloc Construction visit landmark construction projects we are involved in. At the same time, we want to highlight interesting and innovative projects within the construction industry. One of Norway’s largest construction projects is currently underway in Stavanger. A university hospital is being built with a total of 125,000 m2 BTA (gross area). Today there are between 80 and 100 entrepreneurs involved in the construction of the hospital complex, an number that is expected to rise further before the work is complete.

Byggprojekt med solig utsikt, nu blir byggbranschen hållbarare.

Have you heard about Hållbar Byggbransch?

The banking initiative Hållbar Byggransch rolls out on November 27. This means that the banks will change their conditions for granting credit when financing construction. The goal is to clean up the industry and prevent financial irregularities that have become common in Sweden in the last few years. Hållbar Byggbransch is a collaboration between the

Breeam

Breeam – Promotion of environmental certification with Myloc Construction

What does Breeam mean? In the ever-growing construction industry, sustainability is no longer a wish but a necessity. A prominent tool for achieving this is BREEAM, which stands for “Building Research Establishment Environmental Assessment Method”. Originally developed in the UK in the 1990s by BRE (Building Research Establishment), BREEAM has become a world-leading standard for